How long does window installation take?
Homeowner guides

How long does window installation take?

What happens from enquiry to fitting day when replacing windows in Devon, what affects the timescale and how to prepare your home.

Home / Guides / How long does window installation take?

Last updated 24 November 2026

Timescales depend on the number of windows and the house

This guide explains the stages of a window replacement and the factors that make it quicker or longer. We do not publish fixed lead times or fitting durations; your quotation will confirm the plan for your home.

At a glance

  • From enquiry to survey
  • Why windows are made to order
  • What happens on fitting day

From enquiry to survey

The process begins when you contact us with details of the windows you want to replace. A survey follows, where the surveyor measures each opening, checks the condition of the surrounding walls and discusses styles, colours and glazing. Because we are based in TQ1, we can usually arrange a survey quickly for homes around Torbay.

After the survey you receive a quotation describing the windows and the work. Take time to read it, ask questions and confirm any changes. Once you agree, the windows are ordered to the measured sizes.

Why windows are made to order

Replacement windows are manufactured to fit your openings, not taken from a shelf. That is why there is a gap between agreeing the order and fitting day. The length of that gap depends on the manufacturer, the product, colour choices and the time of year.

Unusual shapes, special colours or specific glass can add to manufacturing time. Ask for an expected timescale when you confirm the order rather than assuming one. Your installer will contact you to arrange a fitting date once the windows are ready.

What happens on fitting day

Installers usually work one opening at a time, removing the old window and fitting the new one before moving on. That keeps the house secure and limits how long any room is open to the weather. Each new frame is fixed, levelled and sealed, then the glass is fitted and the inside finished.

The number of windows that can be fitted in a day varies. A small terrace may be completed quickly, while a larger house or one with bays and difficult access can take longer. Your installer can give an idea of the expected duration for your particular job.

Factors that change the timescale

Bay windows take longer than flat windows because of the structural work involved. Upper-floor windows may need access equipment. Rotten timber, crumbling render or damaged sills can uncover extra work once the old frames are out. Bad weather can also affect when outside work is possible.

Discuss anything that might complicate the job at the survey. Our bay window replacement guide covers the additional steps for bays. The more the surveyor knows in advance, the more accurately the work can be planned.

Preparing your home

Clear window sills and move furniture back from the windows being replaced. Take down curtains, blinds and anything fixed near the frames. Cover belongings you cannot move. Fitting creates some dust, so protecting electronics and soft furnishings is sensible.

Make sure there is clear access outside, including paths and gates. Let neighbours know if access might affect them. Keep children and pets away from the work area for their safety. Our experienced installers take pride in tidy, careful work, and a clear space helps them work efficiently.

After the installation

Once fitted, the installers should show you how to operate the windows, including locks, handles and any trickle vents. Check that each window opens, closes and locks smoothly. Raise anything that does not feel right before they leave.

You should then receive certification confirming that the installation has been notified for building regulations. County Windows displays CERTASS registration. Keep that certificate safe with your guarantee and invoice.

Replacing windows in stages

You do not have to replace every window at once. Some homeowners start with the front elevation or the coldest rooms and complete the rest later. Splitting the work this way spreads the disruption across separate visits, and each stage is quoted and planned on its own.

If you take this route, keep a note of the product, colour and glass used in the first stage so later windows match. Ask the surveyor to measure the remaining openings when the time comes rather than relying on old measurements, because frames and walls can change.

Planning ahead

If you have a particular deadline, such as an event or a house sale, mention it when you enquire. That helps set realistic expectations about manufacturing and fitting. Leave some margin rather than planning everything around a single date.

You can start by browsing our uPVC windows or aluminium windows, or by requesting a quotation. Our office hours are Monday to Friday, 7am to 4pm, and you can call 01803 310800 to discuss timings.

Sources and further reading

Discuss your home with County Windows

Explore our replacement windows or request a quotation for your property. Explain your priorities and the condition of the existing openings so the survey can establish an appropriate specification.

All homeowner guides

Frequently asked questions

How quickly can you survey my home?

We are based in TQ1, so we can usually arrange a survey quickly for homes around Torbay.

Why is there a wait between ordering and fitting?

Windows are made to measure for your openings, so they are manufactured after the survey and order.

Will my house be open to the weather all day?

Installers usually replace one opening at a time, which limits how long any room is exposed.

Do I need to move furniture before fitting?

Yes, clear the sills and move furniture back from windows being replaced, and remove curtains and blinds.